SERVICE CLASSIFICATION OF HOIST

Safe and effective operation of the hoist is dependent on correct classification of the hoist’s operation group. According to FEM9.511 and China standard the hoist’s operating group can be determined from load spectrum and average Daily operating time.

Load Spectrum

The load spectrum can be determined from the table below

Hoist load spectrum classification chart
Light Occasional full load Usually light loadSmall fixed loadMedium Occasional full load Usually light loadAverage fixed loadHeavy Repetitive full load Usually average loadHeavy fixed loadVery Heavy Usually almost full load Very heavy fixed load

Average daily operating time

The average daily operating time of the hoist can be calculated from the running time of the hoisting machinery (Hours/day):
H =average hoisting height (m)
N =number of work cycles per hour(cycles/h)
T =daily working time (h)
V =hoisting speed (m/min)

Hoist average daily operating time chart

Determining the operating group of the hoist

When the load spectrum and the average daily operating time of the hoist are identified, the hoist’s operating group is obtained from the table below:

Load SpectrumAverage daily operating timeISO(GB) / FEM ( hours per day)
 ≤ 0.5≤1 ≤2 ≤4 ≤8 ≤ 16
Light  M3 1BmM4 1AmM5 2mM6 3m
Medium M3 1BmM4 1AmM5 2mM6 3mM7 4m
HeavyM3 1BmM4 1AmM5 2mM6 3mM7 4m 
Very HeavyM4 1AmM5 2mM6 3mM7 4m 

Comparing of crane class

工Duty Code
ISO/BS/DINM3M4M5M6M7M8
GBA3A4A5A6A7A8
FEM1Bm1Am2m3m4m5m
CMAAABCDEF
HMIH2H3H4H5H5H6

Hoist Standard Value ( Hr)
SWP(h)4008001,6003,2006,30012,500
Duty %ED253040506060
Starts (s/h)150180240300360360
Run Time(h)3,2006,30012,50025,00050,000100,000
Starts480,0001,134,0003,000,0007,500,00018,000,00042,000,000
Overloads1,0001,0001,0001,0001,0001,000

Similar Posts